Phase I Environmental Site Assessment (ESA)

by IAQ Services Inc.

A Phase I Environmental Site Assessment is a report prepared for a real estate holding which identifies potential or existing environmental contamination . The analysis, often called a Phase I ESA, typically addresses both the underlying land as well as physical improvements to the property; however, techniques applied in a Phase I ESA never include actual collection of physical samples or chemical analyses of any kind. Scrutiny of the land includes examination of potential soil contamination, groundwater quality, surface water quality and sometimes issues related to hazardous substance uptake by biota. The examination of a site may include: definition of any chemical residues within structures; identification of possible asbestos containing building materials; inventory of hazardous substances stored or used on site; assessment of mold and mildew; and evaluation of other indoor air quality parameters[1].

Actual sampling of soil, air, groundwater and/or building materials is typically not conducted during a Phase I ESA. The Phase I ESA is generally considered the first step in the process of environmental Due Diligence. This type of study is alternatively called a Level I Environmental Site Assessment. Standards for performing a Phase I site assessment have been promulgated by ASTM in Standard E1527-05.[2] If a site is considered contaminated, a Phase II Environmental Site Assessment may be conducted, ASTM test E1903, a more detailed investigation involving chemical analysis for hazardous substances and/or petroleum hydrocarbons.

 History

As early as the 1970s specific property purchasers in the USA undertook studies resembling current Phase I ESAs, to assess risks of ownership of commercial properties which had a high degree of risk from prior toxic chemical use or disposal. Many times these studies were preparatory to understanding the nature of cleanup costs if the property was being considered for redevelopment or change of land use.

Leaking underground storage tanks are one source of hazardous substance liability

In the United States of America demand increased dramatically for this type of study in the 1980s following judicial decisions related to liability of property owners to effect site cleanup. Interpreting the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA), the U.S. courts have held that a buyer, lessor, or lender may be held responsible for remediation of hazardous substance residues, even if a prior owner caused the contamination; performance of a Phase I Environmental Site Assessment, according to the courts’ reasoning, creates a safe harbor, known as the 'Innocent Landowner Defense' for such a new purchaser or his lenders.

In 1998 the necessity of performing a Phase I ESA was underscored by congressional action in passing the Superfund Cleanup Acceleration Act of 1998[3]. This act requires purchasors of commercial property to perform a Phase I study meeting the specific standard of ASTM E1527: Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process.

The most recent standard is ASTM E1527-05 which has become known as 'All Appropriate Inquiry' (AAI). Previous guidances regarding the ASTM E1527 standard were ASTM E1527-97 and ASTM E1527-00.

Residential property purchasers need only conduct a site inspection and chain of title survey.

 Actions triggering the Phase I ESA

A variety of actions[4] can cause a Phase I study to be performed for a commercial property, the most common being:

bullet

Purchase of real property by a person or entity not previously on title.

bullet

Contemplation by a new lender to provide a loan on the subject real estate.

bullet

Partnership buyout or principal redistribution of ownership.

bullet

Application to a public agency for change of use or other discretionary land use permit.

bullet

Existing property owner’s desire to understand toxic history of the property.

bullet

Compulsion by a regulatory agency who suspects toxic conditions on the site.

bullet

Divestiture of properties

 Scope of the Phase I ESA

Asbestos-containing materials are not typically surveyed or sampled in a Phase I site inspection, but suspect building materials may be noted

Depending upon precise protocols utilized, there are a number of variations in the scope of a Phase I study. The tasks listed here are extremely common to almost all Phase I ESAs:

bullet

Performance of an on-site visit to view present conditions (chemical spill residue, die-back of vegetation, etc) ; hazardous substances or petroleum products usage (presence of above ground or underground storage tanks, storage of acids, etc.); and evaluate any likely environmentally hazardous site history.

bullet

Evaluation of risks of neighbouring properties upon the subject property

bullet

Interview of persons knowledgeable regarding the property history (past owners, present owner, key site manager, present tenants, neighbours).

bullet

Examine municipal or county planning files to check prior land usage and permits granted

bullet

Conduct file searches with public agencies (State water board, fire department, county health department, etc) having oversight relative to water quality and soil contamination issues.

bullet

Examine historic aerial photography of the vicinity.

bullet

Examine current USGS maps to scrutinize drainage patterns and topography.

bullet

Examine chain-of-title for Environmental Liens and/or Acivity and Land Use Limitations (AULs).

Non-Scope Items in a Phase I Environmental Site Assessments can include visual inspections or records review searches for:

bullet

Asbestos Containing Building Materials (ACBM)

bullet

Lead-Based Paint

bullet

Lead in Drinking Water

bullet

Mold

bullet

Radon

bullet

Wetlands

bullet

Threatened and Endangered Species

bullet

Earthquake Hazard

 Preparers

Often a multi-disciplinary approach is taken in compiling all the components of a Phase I study, since skills in chemistry, atmospheric physics, geology, microbiology and even botany are frequently required. Many of the preparers are environmental scientists who have been trained to integrate these diverse disciplines. Many states have professional registrations which are applicable to the preparers of Phase I ESAs; for example, the state of California has a registration entitled Registered Environmental Assessor.

Under ASTM E 1527-05 parameters were set forth as to who is qualified to perform Phase I ESAs. The new parameter defined an Environmental Professional as someone with 1) a current Professional Engineer's or Professional Geologist's license or registration from a state or U.S. territory with 3 years equivalent full-time experience; 2) have a Baccalaureate or higher degree from an accred institution of higher education in a discipline of engineering or science and 5 years equivalent full-time experience; or 3) have the equivalent of 10 years full-time experience.

A person not meeting one or more of those qualifications may assist in the conduct of a Phase I ESA if the individual is under the supervision or responsible charge of a person meeting the definition of an Environmental Professional when concluding such activities.

Most site assessments are conducted by private companies independent of the owner or potential purchaser of the land.

 

 Examples

While there are a myriad of sites that have been analyzed to date within the United States, the following list will serve as examples of the subject matter:

bullet

Auke Bay U.S. Postal Facility, Juneau, Alaska

bullet

Esso Canada Ltd. Former Bulk Fuels Facility, Owen Sound, Ontario, Canada

bullet

Dakin Building, Brisbane, California

bullet

East Elk Grove Specific Plan, Elk Grove, California

bullet

Mariners Marsh Park, Staten Island, New York

bullet

Richmond State Hospital Farm Industrial Park, Wayne County, Indiana

bullet

Sydney Steel Plant Lands, Sydney, Nova Scotia

bullet

Weyerhauser Technology Center, Federal Way, Washington

 Other types of ESA

Storage and handling of toxics is assessed for each site within a Phase I study.

There are several other report types that have some resemblance in name or degree of detail to the Phase I Environmental Site Assessment:

Phase II Environmental Site Assessment is an investigation which collects original samples of soil, groundwater or building materials to analyze for quantitative values of various contaminants[5]. This investigation is normally undertaken when a Phase I ESA determines a likelihood of site contamination. The most frequent substances tested are petroleum hydrocarbons, heavy metals, pesticides, solvents, asbestos and mold.

Phase III Environmental Site Assessment is an investigation involving remediation of a site. This study normally involves assessment of alternative cleanup methods, costs and logistics. The associated reportage details the steps taken to perform site cleanup and the follow-up monitoring for residual contaminants.

Limited Phase I Environmental Site Assessment is a truncated Phase I ESA, normally omitting one or more work segments such as the site visit or certain of the file searches. When the field visit component is deleted the study is sometimes called a Transaction Screen.

Environmental Assessment has little to do with the subject of hazardous substance liability, but rather is a study preliminary to an Environmental Impact Statement, which identifies environmental impacts of a land development action and analyzes a broad set of parameters including biodiversity, environmental noise, water pollution, air pollution, traffic, geotechnical risks, visual impacts, public safety issues and also hazardous substance issues.

About IAQ Services Inc.

IAQ Services Inc. is a full service consulting firm in the areas of environmental health and safety testing and remediation.  The firm was incorporated in 1999.  Stuart Bagley is the principle consultant for IAQ Services Inc.  He is a Certified Industrial Hygienist (CIH) and a Certified Safety Professional (CSP) with 25 years of experience in environmental health.  He has a Master of Science degree in Occupational and Environmental Health from Wayne State University.  He has broad experience in both industrial hygiene and safety with an emphasis on indoor environmental quality and environmental health programs.  Stuart’s field experience includes serving as a Compliance Safety and Health Officer for USDOL-OSHA and working in corporate safety management. 

How may we be of assistance to you?

Call 800-862-9655 or email us at: sbagley@indoorairsite.com

Return to Home Page

References

  1.  Martin N. Sara, Site Assessment and Remediation Handbook, CRC Press (2003)

  2.  ASTM official site

  3.  Superfund Cleanup Acceleration Act of 1998, U.S. Congress, March 26, 1998

  4.  Thomas M Missimer and Missimer M Missimer, A Lender's Guide to Environmental Liability Management CRC Press (1996)

  5.  Environmental Aspects of Real Estate and Commercial Transactions: From Brownfields to Green Buildings, American Bar Association, ed. by James B. Witkin (2002)

 External links

bullet

ASTM E1527-05 Standard Guide for Phase I Studies

bullet

Legal perspective on Phase I studies